North Carolina Museum of History
Raleigh, NC
Water testing of the skylight was required to identify the source of leakage to enable design of the appropriate repairs.
|
| |
|
|
|
The new roof system included a vapor retarder, two layers of insulation and a two ply modified asphalt membrane system.
|
| |
The original sealants were severely deteriorated and failing, allowing moisture to enter the building. New sealant was installed in the prepared joints between each of the precast concrete panels.
|
| |
Recertification of the lightening protection system was required.
|
|