|
Kerr Group, Inc.
Ahoskie, NC
Roof replacement included the installation and removal of plastic sheeting to protect manufacturing from dust and debris.
|
| |
Reroofing involved removing the two existing roof systems and wet insulation and some deck repair.
|
| |
Some areas of the metal roof deck required repair.
|
| |
The new roof system included two layers of insulation and a white, mechanically attached single ply membrane.
|
|