Highwoods Tower 1
Raleigh, NC
The joint sealants on this ten story office building were severely deteriorated and failing, allowing moisture to enter the building.
Joint sealants, including those at the precast concrete panels as well as at the window system, were removed and replaced.
Restoration work was also completed at the ninth floor terraces.
>>See additional photos
