Bowater
Newsprint
Calhoun, TN ![]() Implementing the long-range reroofing plan for this industrial plant campus. ![]() The work at this industrial campus required structural steel repair and painting, replacing concrete deck slabs, adding roof drains and installing a vapor retarder.
Tapered insulation was installed for improved roof drainage.
A durable modified asphalt membrane was applied, tailored to survive the
harsh industrial environment. |