Bowater Newsprint
Calhoun, TN



Implementing the long-range reroofing plan for this industrial plant campus.



The work at this industrial campus required structural steel repair and painting, replacing concrete deck slabs, adding roof drains and installing a vapor retarder.

Tapered insulation was installed for improved roof drainage. A durable modified asphalt membrane was applied, tailored to survive the harsh industrial environment.